Design of Cable Stack &Sea Fastening-London-United Kingdom.(2005)

Description: The Cable Stack is designed for supply and installation of submarine cables, for Salman EPC-3 offshore project that is located in the Persian Gulf. Documents contain analysis and design calculation note for cables stack structure. Two units of this structure have been fabricated in the UK. (DNV – Abudhabi office have approved design documents) The cable stack after coiling the cable transported to the nearby port for onward shipment by cargo vessels to a port in the Persian Gulf. Lloyd’s insurance Co. made insurance based on approved supervision documents By BUREAU of Veritas for sea fastening. A company in Brighton manufactured the structure.

Type of order: Structural design & Supervision Full scope structural consultancy, supervision in London, Design of sea fastening have been carried out up to the DNV approval on design & super vision that shows the Quality of job.

Owner/Client: Petro – Iran Company.

Ordered by: Amid Engineering and Development company as EPC contractor.

AMID Company Manager: Dr. A.A.Golafshani.

AMID Company Lead Eng: Prof. Ali Akbar Aghakoochak.

Lead Engineer in the UK: Dr. Amin Ghafooripour.

Project Manager: Amid Eng.co.

Architect: None.

Structural/Civil Eng.: Dr. Amin Ghafooripour.

Mech. & Elec. Eng.: None.

Supervision/Construction: DNV-UK

Contractor: Little Hampton company –South Hampton

Location: little Hamptown factory – South Hamptown Industrial Real Estate – Brighton – London – UK

Project size: 700sqm

Construction cost: 90000 USD

Engineering Software: AutoCAD 2000-SAP 2000-ETABS 2000-Safe2000.

Date of project: 2005