Ebara Pump Factory (2008)
Description: Ebara pump factory has been located in Tehran-Parand district. Ebara factory project consists of three different buildings:
- Main production hall
- Office building
- Guard house
Main production hall building has two equal gable bays that each one has 18 meters; one bay has a 5 ton overhead crane. The length of the hall is 81 meters. The height of hall at the highest location is 13.2 meters and at the lowest level is 6.3 meters. Walls compositions are made of concrete and sandwich panels, which the heights of concrete walls are 1.2 meters. Hinge connections with bracings in both directions are the structural system of the main hall. Gravity loads will be conducted to the ground by truss system, and lateral loads will be carried by bracings.
The office building is about 500 square meters and with three stories. Walls are made of sandwich panels.
Guard house walls are made of sandwich panels.
To the precise analysis and surveys, different structural systems have been considered.
Type of order: Architectural, Structural, Electrical and Mechanical Design including Basic & Detail Design.
Owner/Client: Ebara Company.
Ordered by: Dr. Kamran Afshar Naderi.
Lead Engineer: Dr. Amin Ghafooripour.
Project Manager: Dr. Amin Ghafooripour.
Architect: Dr.Kamran Afshar Naderi for concept & Basic design. Dr. Amin Ghafooripour, Ali Zare, Marjan Tabrizi for detail design.
Structural/Civil Eng.: Dr. Amin Ghafooripour, Nastaran Ashtari, A.M.M.Tabrizi, Heydar Abbasi, Fatemeh Ashtari, Azar Kari, Hessam Shamshiri, Erfan Abbasi, Aila Tanhaei.
Mech. & Elec. Eng.: Gholamreza Khalaji, Mehrdad Jafarzade
Supervision/Construction: Not information available.
Contractor: Not information available.
Location: Parand district-Ebara factory-Tehran-Iran.
Project size: 3500sqm
Construction cost: by client.
Engineering Software: AutoCAD 2004-SAP 2000-ETABS 2000-Safe2000.
Date of project: 2008