Innovation of Prefabricated Steel Connection for Precast Concrete Frame (2010)
Description: The objective of this project is to innovate “Prefabricated Steel Connection for Precast Concrete Frame.” Consulting Engineers Company will be responsible for the design of structures that will be used for main construction. Full-scale test carried out for this model in BHRC structural laboratory.
Type of Order: Theoretical studies, test procedure and experimental tests for implementation of a design procedure for “Prefabricated Steel Connection of Precast Concrete Frame.
Owner/Client: Iran Frameco Company
Ordered by: Iran Frameco Company
Lead Engineer: Dr. Amin Ghafooripour
Project manager: Mr. Hossein Kiamehr
Architect: N.I.A.
Structural/Civil Eng.: Mr. Hossein Kiamehr
Researchers: Hossein Kiamehr, Inventor and Project Manager; Hassan Mahboobi (Researcher)
Mech. & Elec. Eng.: N.I.A.
Supervision/Construction: N.I.A.
Contractor: Iran Frame Co.
Location: Hashtgerd – Iran
Project size: N.I.A.
Construction cost: N.I.A.
Engineering Software: Abaqus – SAP 2009 – Auto Cad 2010
Date of project: 2010