Repair of Bandar Abbas jetty and trestle (2008)
Description: Shavac Co repaired ore Unloading Jetty, trestle located in iron one and mines special Free zone in Bandar Abbas city (in the Persian Gulf). Management of this project and consultancy awarded to Pars Padir Consulting Engineers, on behalf of Shavac Co. Tehran Berkeley Co. carried out supervision.
Type of order: Structural design and repair
Owner/Client: Special Zone for steel and ores of Persian Gulf – Bandar Abbas
Ordered by: Shavac Co.
Lead Engineer: Dr. Amin Ghafooripour
Project manager: Dr. Amin Ghafooripour
Architect: N.I.A.
Structural/Civil Eng.: Amin Ghafooripour, Fatemeh Ashtari
Mech. & Elec. Eng.: N.I.A.
Supervision/Construction: Tehran Berkeley consulting Eng.
Contractor: Shavac Co.
Location: Special zone for steel & ores – Bandar Abbas – Iran
Project size: N.I.A.
Construction cost: 4.000.000 USD
Engineering Software: N.I.A.
Date of project: 2008