SCADA Buildings (2200 km Ethylene pipeline) (The new philosophy for future design method) (2010)

Description: These buildings are designed primarily for S.C.A.D.A units; 100 Buildings are located from Assaluye to Mahabad along the 2200 km Ethylene pipeline to monitor the pipeline. According to the special requirements of this type of structures for instruments, they have been designed in three categories. This regimentation is based on these items: wind load, snow load, soil type, humidity, earthquake effect, temperature, rainfall. Thermal Insulation strictly should be under control, and thus the project could be categorized as smart, green and a sample for the future design. So insulation in every region is designed separately with accuracy. Walls are made from sandwich panels which thicknesses are designed for -10 to +45 degree of centigrade in critical conditions.

Type of order: Full scope consultancy-Basic design-Detail design and supervision.

Owner/Client: Micro moje, NPC_PIDMCO (National Petrocemical Company_Petrocemical Development Industrial Management Company)

Ordered by: Pars Saman Co.

Lead Engineer: Dr. Amin Ghafooripour

Project Manager: Mr. Heydar Abbassi

Architect: ParsPadir Consulting Engineers-Architectural Design office.

Structural/Civil Eng.: Dr. Amin Ghafooripour, Heydar Abbasi , Fatemeh Ashtari, Ali Mohammad Moghaddam Tabrizi

Mech. & Elec. Eng.: Ali Shakibi, Parham Saemi Fard

Technology consultant: N.I.A.

Supervision/Construction: ParsPadir Consulting Eng.

Contractor: Caravan manufacturing Co.

Location: From Assaluye to Mahabad-(100 sites along Ethylene pipeline – western part of Iran.

Project size: 100 units, Area of each one is about 25sqm

Construction cost: 2000000 USD

Engineering Software: Sap 2000 –AUTOCAD-Xsteel

Date of project: 2010

Contact Now