Determination of the level of damage by measuring the charred elements’ thickness and evaluating structural safety.
Evaluation of damage level and preparing reports for the owner and insurance companies.
Evaluation of potential gas explosions to justify the level of damage for insurance reports.
Justification of the Ordinance of Law building upgrade and applying insurance benefits.
Reviewing the insurance policy and supporting the owner for the insurance claim based on cost evaluation.
The charring thickness/rate is measured by caliper precisely to determine the real condition of the building.
Delivering the repair solution and how to remove the cause of damage.
Type of order: Full scope Structural Fire Damage Inspection and Evaluation.
Owner/Client: Private Owners
Lead Engineer: Dr. Amin Ghafooripour, PE
Location and details:
California: Menlo Park, San Jose, Campbell, Cupertino, Berkeley, Oakland, San Francisco,
San Leandro, Hayward, Milpitas, Sunnyvale, Saratoga, San Rafael, Mill Valley, Gilroy,
Los Angeles, San Diego, Sacramento Area, Folsom, Lodi.
The pictures do not reflect a specific project;
details are confidential.
Fire Damage Charring Rate MeasurementFire Damage Moisture Content MeasurementsFire Damage — Determination of the Charred Structural Elements